As a group, write a five to ten page report on lessons learned in running the simulation. Following are examples of the types of information you may wish to include:
a. overall results of your run(s) of the simulationBe certain to include as appendices:
b. Parameters which you set (e.g. setting % of code tested to 60% during periods 5 through 10) which you believe may have had a particularly positive or negative effect upon your results.
c. Difficulties / Benefits of working as a team.
d. Insights into challenges of dynamic versus static modeling of the systems development process
a. Tables A., B., and C. - Decisions as made by your team members - the CIO, Project Manager and Staff Administrator.
b. Saved screen captures ** (gif format) of:1) The Output Screen after all 10 periods are simulated.
2) The Human Resources Graph
3) The First 60 days of the table of DSI Output
** Note: you can capture screens and save them as gifs through the
following steps:
a. Start up Microsoft Imager (comes with Windows-95 - executable may be found under Windows\msapps\msimager\msimager.exe). |